Constructive process
STAGE 1: PLOT OF LAND
Size and shape of the project design
Edge Path field
First on the visual project, a two-dimensional
STAGE 2 : EXCAVATION
Evacuation Earth
Given the path marked on the perimeter , inclination and depth of the project design
Regularization of the land to allow the elevation of the structure on a stable surface.
STAGE 3 : PERIMETER FRAME
The structure of corrugated iron bar mounted inside the excavation or delineation.
Serve as a jute backing
STAGE 4 : CREATING A GRAVEL BASE
a layer of gravel that underlies soil or background extends
Helps combat uneven terrain and improve the depth
5th STAGE: ENCOFRADO . JUTE
sufficient strength to withstand the projection of shotcrete.( constructive peculiarity Piscinas Mijas )
Outline the perimeter inner structure of natural jute 22x22cm defining the form and shape of the pool
6th STAGE: steel reinforcement
Defines the thickness of the vessel walls.
Iron Lace and assembly
7th STAGE: PLUMBING PREINSTALLATION
PVC pipes are placed , and flexible rubber tubes for the circulation of water through the installation
Accessories pools built in the architectural structure of the vessel ( eg background , skimmers … )
Ground Lead
8th STAGE: SHOTCRETE
Shotcrete.
Filling the steel reinforcement
Surface resistant padding to the terms of use of the pool .
9th STAGE: SET TOP
On the walls of the vessel
Combination of white cement and marble dust
Separate with court rules or radial compaction after
10th STAGE: COATING ( gressite )
From the inner surface of the vessel
When fully subject Lechea
Cosmetic application process
11th STAGE: FINAL INSTALLATION OF PLUMBING
The physical cycle the chemical cycle . Purification equipment (motor, filter, and plumbing and electrical panel )
Chemical Dosing Pumps also fed cycle box and connected to a drum
Casetón fiber or engine room
12th STAGE: SET ACCESSORIES
Enable all ports Pool
termination elements and accessories for use and access
Stairs , showers, termination elements , skimmers , bottom , drives, spa items , etc. ..
STAGE 13 : START-UP
Cleaning the glass , granite , and engine room
Filling
Control of the installation prior to commissioning
Filling the filter with siliceous sand
Priming pump operation and put